in reports

2018 Okeanos Explorer EM302 SAT

Cruise ID: EX1810
Multibeam System: EM302
Dates: October, 2018

The primary RX array SAT activities included:

  • 2018-10-02: depart Quonset, RI
  • EM302 TX and RX array survey review
  • EM302 and POS MV geometry / config. review
  • EM302 start-up (by Kongsberg) and BISTs
  • Geometric calibration and verification (‘patch test’)
  • Deep roll verification
  • Deep accuracy testing
  • Swath extinction data collection during transits (including after SAT portion of EX1810)
  • EM302 RX noise vs. speed testing (2018-10-24)
  • 2018-10-05: return Pt. Judith, RI for personnel transfer

Attached Documents

Report:


Related Information