Cruise ID: EX1902
Multibeam System: EM302
Dates: May, 2019
The primary shakedown activities included:
- 2019-05-12: depart Pascagoula, MS
- EM302 and POS MV geometry / config. review
- EM302 dockside BISTs (incl. TX channels)
- Geometric calibration (‘patch test’)
- Backscatter calibration (for Kongsberg processing)
- Roll verification
- Swath extinction data collection during transits
- EM302 RX noise vs. speed testing
- Acoustic interference testing across all systems
- K-Sync SAT and testing with Kongsberg support
- EK60/80 target strength calibrations
- POS MV GAMS calibration
- 2019-05-24: arrive Key West, FL
Attached Documents
Report:
Related Information