2024 R/V Rachel Carson EM2040 SAT

Cruise ID: R/V Rachel Carson Multibeam System: EM2040 Dates: March 21-22, 2024 Executive Summary R/V Rachel Carson (RC) received a major update to its mapping systems during the 2023-24 shipyard period: New Kongsberg EM2040 (0.4° TX / 0.7° RX) New Seapath 380 navigation system with a MRU5 Comprehensive new survey of vessel and sensor offsets by Westlake Consultants The MAC was asked to assist with conducting Sea Acceptance Testing (SAT) of the new EM2040 using the Seapath; due to schedule constraints, the MAC provided remote support from shore for planning and data processing after the SAT; the on-board mapping team included SSSG personnel with multibeam experience and a Kongsberg field engineer (Tony Dahlheim) who completed the Kongsberg SAT contract procedures A number of EM2040 test sites occupied previously by NAVO vessels were prioritized for planning, as the publicly available seafloor data in Puget Sound is often not sufficiently detailed for

2016 Bat Galim 2016 System Review

Vessel: R/V Bat Galim Multibeam System: EM302/EM2040 Dates: January 31 – February 4, 2016  From January 31st to February 4th, 2016 a Shipboard Acceptance Testing (SAT) was conducted on the R/V Bat Galim, owned by the Ministry of National Infrastructures, Energy and Water Resource of Israel and operated by Israel Oceanographic and Limnological Research, on the newly installed Kongsberg Maritime (KM) EM302 (30 kHz) and EM2040 (200 kHz, 300 kHz, and 400 kHz) multibeam echosounders.